Turnkey.mt

Bathroom Renovation in Malta

From strip-out to the final seal — one prime contractor, CheckYourTraders-verified trades, and a bathroom that's done properly.

A bathroom is one of the highest-impact rooms to renovate — and one of the easiest to get wrong, because so much of the work is hidden. Waterproofing, falls to the drain, pipework and electrics all have to be right before a single tile goes on. We deliver the whole renovation as your single prime contractor, strip-out to final seal, using CheckYourTraders-verified trades — one contract, one invoice, one point of contact.

Before and after of a full bathroom renovation in Malta — dated pink suite transformed into a marble walk-in shower
Before & after — a full strip-out and refit, managed end to end.

What a bathroom renovation involves

Each stage is handled by a verified specialist and sequenced by your project manager:

What a bathroom renovation costs in Malta

As a current guide for Malta:

Keeping the suite in its existing position keeps plumbing costs down; moving everything adds to them. These figures are indicative — the Bathroom Calculator below gives a figure for your room, and a free survey turns it into a firm, itemised quote.

Estimate your bathroom renovation

Set the size, number of bathrooms and finish standard for an indicative all-in figure. Then book a free survey for a firm, itemised quote.

6 sqm
1
Indicative all-in cost
€0
1 x 6 sqm · Basic · €600/sqm
Book your free survey for a firm quote →

Indicative only — based on typical Malta bathroom-renovation rates and not a quote. Your on-site survey produces a firm, itemised price.

Permits and getting it right

Most bathroom renovations are internal, non-structural work and don't need a Planning Authority permit. Where you're significantly relocating services or making structural changes, a permit may apply — your project manager confirms this at survey. What matters far more on a bathroom is that the hidden work is done right: waterproofing, ventilation, and certified plumbing and electrics. Every trade on your bathroom is CheckYourTraders-verified, and electrical and plumbing work is carried out by registered professionals — uncertified work here is exactly what causes leaks, damp and failed sales later.

One prime contractor, total accountability

Run as separate trades, a bathroom stalls between the plumber, the tiler and the electrician — and when a leak appears months later, nobody owns it. As your prime contractor we sequence the whole job and carry the accountability ourselves: one contract, one invoice, one named project manager, and payments tied to completed work. The trades come from Malta's largest verified network — 500+ CheckYourTraders-verified professionals.

1
One contract, one invoice, one point of contact
500+
CheckYourTraders-verified professionals
PM
A named project manager from survey to handover

Bathroom renovation FAQ

How much does a bathroom renovation cost in Malta?
As a current guide, a compact bathroom starts from around €2,400, most full renovations land between €3,600 and €9,600, and larger or high-spec bathrooms run above that. Use the calculator on this page for an indicative figure, then book a free survey for a firm quote.
How long does a bathroom renovation take?
A typical full bathroom renovation runs around one to three weeks, depending on size, spec and whether the layout changes. Because every trade is sequenced under one project manager rather than waiting on separate contractors, downtime is kept as short as possible.
Do I need a permit to renovate a bathroom?
Usually not — internal, non-structural bathroom work doesn't normally need a Planning Authority permit. If you're significantly moving services or making structural changes, a permit may apply; your project manager confirms what yours needs at survey.
Can I use the bathroom while the work is going on?
No — the room is out of use for most of the renovation, so it's worth arranging an alternative. We sequence the trades tightly to keep that period as short as possible.
Why does waterproofing matter so much?
It's the hidden layer behind the tiles that stops water reaching the structure. Skipping or rushing it is the single biggest cause of leaks, damp and ruined finishes down the line — which is why it's done by verified trades and signed off before tiling begins.

Ready for a bathroom that's done properly?

One survey, one firm quote, one team accountable from strip-out to final seal.

Book a Free Survey →

More of what we cover

See everything we cover →

← All services